Monday, May 23, 2022
name of Prensa Latina
Bandera inglesa
English Edition
name of Prensa Latina

NEWS

NEWS

Paraguay-Brazil Integration Bridge 75 percent complete

Paraguay-Brazil Integration Bridge 75 percent complete

Asuncion, Jan 23 (Prensa Latina) The construction work of the Integration Bridge that will join the Paraguayan city of Presidente Franco and the Brazilian city of Foz de Yguazú is now over 75 percent complete.
Share on facebook
Share on twitter
Share on whatsapp
Share on telegram
Share on email

This week the placement of the sixth metallic piece on the Paraguayan side of the work and the seventh on the Brazilian side was completed, and both ends were 280 meters away from joining, according to a report released by Itaipu Binacional.

The bridge is cable-stayed and the central section isa deck supported at several points of its extension by ropes fixed to the balance box, while the inverted “Y” mast and the decks are the ones that receive and transmit the loads.

The future road connection will be 760 meters long, with a central span of 470 meters wide and more than 60 meters high, and Itaipu Binacional is in charge of the US$ 84 million investment.

mh/abo/rgh/dla

ÚLTIMO MINUTO
name of Prensa Latina

| Text SMS to 8100 with content PL
Receive 4 mesages x 25 cup

© 2016-2021 Prensa Latina
Latin American News Agency

Radio – Publications  – Videos – News by the minute.
All Rigts Reserved.

St. E No 454 , Vedado,  Habana, Cuba.
Phones: (+53) 7 838 3496, (+53) 7 838 3497, (+53) 7 838 3498, (+53) 7 838 3499
Prensa Latina © 2021 .

Web Site developed by IT Division  Prensa Latina.