Tuesday, September 01, 2026
name of Prensa Latina
Bandera inglesa
English Edition
Search
Close this search box.
name of Prensa Latina

NEWS

NEWS

Installation of energy storage system advances in Cuba

Holguin, Cuba, Aug 22 (Prensa Latina) — The Cueto Battery Energy Storage System (BESS), located in this eastern province, is set to begin load testing in the coming days, ahead of its official commissioning.

The facility, which has a capacity of 50 megawatts (MW), requires approval and technical assistance from Chinese advisors to ensure the stability of the National Electric System (SEN).

The centralized unit program already has a BESS operational in El Cotorro, Havana; it contributes 50 MW to grid regulation and provides backup service in the event of contingencies at large power plants.

With installation work progressing in Cueto, Bayamo (Granma province), and in the city of Holguin, the country aims to add 200 MW of regulation capacity to respond more quickly to demand peaks and optimize the use of renewable energy sources.

jdt/ool/dpg/

LATEST NEWS
RELATED